Here the guys are working on the XGD exit trench for 1 green. When the XGD was installed an existing line wasn't close enough to tie in the system so we were responsible for extending the trench to an existing line.
I had hopes of getting more drainage done but the temperatures have dropped substantially and the ground is beginning to freeze along with measureable snow on the way. Trying to do drainage at this time would only make a mess especially that the areas we are adding drainage are in the fairways and approaches. We'll hold off until the spring to pick up on the drainage projects. Winter is here, after tomorrow we will be down to our winter staff.